Client Architectural & Engineering Proposal

HK Farmhouse — Dual-Marquee Event Complex

A precision-engineered master plan for your 201'-1" × 782'-8" Mohlanwal Road property, combining a monumental 165'-0" Ø Column-Free Round Marquee with a 30' × 50' Glass House Lobby at the rear and a versatile 80' × 360' Straight Marquee at the front, supported by 200+ on-site parking stalls.

HK Farmhouse 3D Architectural Board
Click any drawing or 3D render to enlarge in full resolution
141,099 sq. ft.
Surveyed Plot Area (25.91 Kanals / 3.24 Acres)
51,682 sq. ft.
Total Covered Event & Lobby Footprint
~3,000+ Guests
Combined Banquet Capacity (Both Venues)
200+ Cars
Dedicated Front & West-Side On-Site Parking
01 / Surveyed Geometry & Master Layout

Scale-Accurate Site Plan & Boundary Verification

Every structure has been plotted directly against your 7 surveyed Google Earth / CAD boundary edges (`201'-1"` Mohlanwal Road frontage, `782'-8"` East, `511'-10"` West, `99'-0"` & `139'-7"` Notch, `220'-9"` & `52'-4"` Peak).

HK Farmhouse Master Site Plan

Master Site Plan: 165' Round + 80'×360' Straight + Parking

Shows Mohlanwal Road frontage, 200+ car parking bays, 28'-0" main boulevard, and both marquee complexes.

165 ft Round Marquee Detail Plan

Rear 165'-0" Ø Marquee, Glass Lobby & BOH Detail

Enlarged architectural layout showing the 30'×50' Glass House Lobby, 36'×26' Kitchen, 24'×18' Pantry, 3F+3M Washrooms, and exact pinch clearances.

02 / Architectural Program

Two Independent Venues with Full Back-of-House Support

Venue 1 (Rear): 165'-0" Ø Round Dome Marquee

  • Main Hall: 165'-0" diameter (21,382 sq. ft.), column-free radial steel tension dome with 24 truss bays and illuminated central cupola (~1,100–1,300 banquet guests).
  • Glass House Lobby: 50'-0" wide × 30'-0" deep (1,500 sq. ft.) steel-and-glass entrance pavilion facing the arrival plaza, clearing the inner notch corner by 2'-3".
  • Right-Back Kitchen & Pantry: 36'-0" × 26'-0" commercial kitchen (936 sq. ft.) + 24'-0" × 18'-0" dry/cold pantry (432 sq. ft.) tucked inside the 52'-4" rear peak with direct BOH service access.
  • Left-Back Washrooms: Two dedicated 16'-0" × 14'-0" restroom blocks (3 Female stalls + 3 Male stalls) with vanity corridors.
Boundary EdgeClearance from 165' WallStatus
East (`782'-8"`)1'-1" (1.11 ft)Tight Pinch
North-West (`220'-9"`)1'-3" (1.27 ft)Tight Pinch
Notch (`139'-7"`)1'-7" (1.57 ft)Tight Pinch
Inner Notch Vertex16'-10" (16.83 ft)Clear

Venue 2 (Front): 80'-0" × 360'-0" Straight Marquee + Parking

  • Main Hall: 80'-0" × 360'-0" clear-span PEB / tensile hall (28,800 sq. ft.) positioned along the East side with a 9'-6" perimeter service corridor.
  • Modular Partitioning: Equipped with acoustic sliding partition tracks at 120' intervals—operate as 1 mega-hall (~1,800–2,000 guests), 2 halls (80' × 180'), or 3 halls (80' × 120' / 9,600 sq. ft. each).
  • Front Guest Parking: 188' × 120' paved lot (~22,560 sq. ft. / ~80 cars) directly inside the Mohlanwal Road gate.
  • West Side Parking Bay: ~65' × 365' paved bay (~23,725 sq. ft. / ~95 cars) running parallel to the straight marquee.
  • 28'-0" Main Boulevard & North Drop-Off: Straight palm-lined road leading to the rear Glass House Lobby (~25–30 overflow/VIP cars).
03 / Interactive 3D Site Model

Explore HK Farmhouse in Real-Time 3D

Drag to orbit, scroll to zoom, or select a camera preset below to inspect the exact spatial relationship between Mohlanwal Road, the 80'×360' Straight Marquee, parking bays, and the rear 165' Round Dome.

Interactive WebGL 3D Model (1 unit = 1 ft)
05 / Technical & MEP Specifications

Structural, HVAC & Execution Roadmap

Structural System

  • 165' Round Marquee: 24-bay radial high-tensile steel truss dome, 24' eave height, 56' apex cupola, 850 GSM PVDF double-layer insulated membrane.
  • 80'×360' Straight Marquee: Clear-span PEB portal frames at 20' bay spacing, 22' eave, 36' ridge, insulated sandwich roof + tempered glass facade.

MEP & Climate Control

  • HVAC Estimate: ~150 TR packaged/chiller cooling for the 165' Round Marquee + ~200 TR zoned cooling for the 80'×360' Straight Marquee.
  • Power & Acoustic: Dedicated 500 kVA standby backup zone near rear BOH; STC-45+ acoustic partitions for modular hall splitting.

Execution Notes

  • Pinch-Point Engineering: East (`1'-1"`), NW (`1'-3"`), and Notch (`1'-7"`) edges around the 165' dome require internal rainwater gutters & zero external scaffolding overhang.
  • Phased Delivery: Phase 1 (Civil, Parking & 80'×360' Front Hall) → Phase 2 (165' Dome, Glass Lobby & Rear BOH).